Atlantis Set for Feb. 7 Launch

January 31, 2008
Atlantis Set for Feb. 7 Launch

This flexible hose carries Freon through Atlantis' cooling system. Photo credit: NASA

NASA managers formally set the launch of space shuttle Atlantis for Feb. 7 at 2:45 p.m. EST, pending analysis of a flexible hose in the shuttle's radiator cooling system.

During an inspection of Atlantis Tuesday, one of four hoses that carry Freon to the shuttle radiators in the payload bay was found bent and not properly retracted in its storage box. The others were fully retracted into their storage boxes, as expected. Teams are continuing to gather data and assess any potential forward work. Managers will convene Saturday to further review and analyze what, if any, remaining work is required before launch.

During the 11-day mission, Commander Steve Frick and his six crewmates will install the European Space Agency's new Columbus laboratory on the International Space Station. Columbus will expand the research facilities of the station and provide scientists around the world with the ability to conduct a variety of life, physical and materials science experiments. The mission will include three spacewalks, delivery of a new crew member to the station and the return of another astronaut after nearly four months aboard the complex.

Atlantis' launch date was announced at the conclusion of Wednesday’s executive-level Flight Readiness Review. The one-day video teleconference meeting was led from NASA Headquarters in Washington. Top NASA and contractor managers assessed any risks associated with the mission and determined whether the shuttle's equipment, support systems and procedures are ready for flight. The first executive-level Flight Readiness Review for STS-122 was held Nov. 30.

The STS-122 mission was delayed in December 2007 after failures occurred in a fuel sensor system while Atlantis' external fuel tank was being filled. A tanking, or fueling, test on Dec. 18, 2007, revealed that open circuits in the external tank's feed through connector were the most likely cause of false readings in the system during launch attempts on Dec. 6 and Dec. 9. A modified connector was designed with pins and sockets soldered together. Both the original and modified connector configurations were subjected to testing that verified that the new design corrects the open circuits found in the original connector.

The sensor system is one of several that protect the shuttle's main engines by triggering their shut down if fuel runs unexpectedly low. NASA's current Launch Commit Criteria require that three of the four engine cutoff, or ECO, sensors function properly before liftoff from the Kennedy Space Center in Florida.

Joining Commander Frick on STS-122 will be pilot Alan Poindexter and mission specialists Leland Melvin, Rex Walheim, Stanley Love and European Space Agency astronauts Hans Schlegel and Leopold Eyharts. Eyharts will replace current station crew member Dan Tani, who has lived on the outpost since October. Eyharts will return to Earth on shuttle Endeavour's STS-123 mission, currently targeted for launch on March 11, 2008.

Source: NASA

2.5 /5 (2 votes)  

Rank 2.5 /5 (2 votes)
Tags

Relevant PhysicsForums posts
  • Scale of the Universe
    created12 hours ago
  • Titan's lack of impact craters
    createdFeb 09, 2012
  • Real pictures of black hole eating a star?
    createdFeb 08, 2012
  • Hypothetical way to travel faster than light, but not technically exceed lightspeed
    createdFeb 06, 2012
  • How do scientists monitor the Sun's activity?
    createdFeb 05, 2012
  • Search patterns in observational studies
    createdFeb 05, 2012
  • More from Physics Forums - General Astronomy

More news stories

Humans may have helped the decline of African rainforests 3000 years ago

(PhysOrg.com) -- Large areas of rainforests in Central Africa mysteriously disappeared over three thousand years ago, to be replaced by savannas. The prevailing theory has been that the cause was a change ...

Space & Earth / Environment

created 23 hours ago | popularity 4.3 / 5 (13) | comments 13 | with audio podcast report

Could Venus be shifting gear?

(PhysOrg.com) -- ESA’s Venus Express spacecraft has discovered that our cloud-covered neighbour spins a little slower than previously measured. Peering through the dense atmosphere in the infrared, the ...

Space & Earth / Space Exploration

created 19 hours ago | popularity 5 / 5 (7) | comments 8 | with audio podcast

NASA budget will axe Mars deal with Europe: scientists

US President Barack Obama's budget proposal to be submitted next week for 2013 will cut NASA's budget by 20 percent and eliminate a major partnership with Europe on Mars exploration, scientists said Thursday.

Space & Earth / Space Exploration

created 22 hours ago | popularity 5 / 5 (2) | comments 19

Mars Science Laboratory computer issue resolved

(PhysOrg.com) -- Engineers have found the root cause of a computer reset that occurred two months ago on NASA's Mars Science Laboratory and have determined how to correct it.

Space & Earth / Space Exploration

created 20 hours ago | popularity 4.7 / 5 (6) | comments 4 | with audio podcast

Two new moons for Jupiter

Advances in technology have lead to the discovery of new planets outside of our Solar System, and now even new moons in our own backyard.

Space & Earth / Space Exploration

created 19 hours ago | popularity 4 / 5 (1) | comments 7


Anonymous knocks CIA website offline (Update)

The website of the Central Intelligence Agency was inaccessible on Friday after the hacker group Anonymous claimed to have knocked it offline.

New error-correcting codes guarantee the fastest possible rate of data transmission

Error-correcting codes are one of the triumphs of the digital age. They’re a way of encoding information so that it can be transmitted across a communication channel — such as an optical fiber o ...

Small modular reactor design could be a 'SUPERSTAR'

(PhysOrg.com) -- Though most of today's nuclear reactors are cooled by water, we've long known that there are alternatives; in fact, the world's first nuclear-powered electricity in 1951 came from a reactor ...

New power source discovered

(PhysOrg.com) -- Researchers at the Massachusetts Institute of Technology (MIT) and RMIT University have made a breakthrough in energy storage and power generation.

The power of estrogen -- male snakes attract other males

A new study has shown that boosting the estrogen levels of male garter snakes causes them to secrete the same pheromones that females use to attract suitors, and turned the males into just about the sexiest ...

Google users warned of threat to smartphone wallets

Users of Google smartphone wallets were being warned on Friday that there is a way to crack pass codes intended to thwart thieves from going on illicit shopping sprees.