The B-Factory Returns for its Last Hurrah
User rating: 4 / 5 after 3 vote(s)
During the B-Factory's last major downtime this fall, the vacuum group replaced almost 190 RF seals with this new model in PEP-II's High Energy Ring. Credit: SLAC
This week, the B-Factory will begin running practically non-stop for 10 months, aiming for the endurance of a marathoner and the peak performance of a sprinter. Early this week, the PEP-II accelerator crew plans to begin circulating beams in the PEP rings after a three-month downtime, readying for collisions in the BaBar detector later this week.
Full story »